Spektrum RC 3.7g Sub-Micro Analog Air Servo w/Long Lead

Spektrum RC 3.7g Sub-Micro Analog Air Servo w/Long Lead
Location:
Stock: 0
Price: $13.99
This is the Spektrum 3.7g Sub-Micro Analog Air Servo with a long lead, intended as an optional part for the V-22 Osprey VTOL.

This product was added to our catalog on May 24, 2019